A big IT decision ahead? Let's look at it before you sign.
The vendor's proposal looks sensible, but it was written by whoever gets to bill the work. I read it on your side, find out what it really rests on, and tell you straight what you need and what you don't. I don't need to know the system beforehand. I work alongside your own IT, not instead of it.
Book a 15 min callDo you recognize these situations?
A decision nobody has checked
A one-off review, or support in the decisions
I can help in two ways, and in both I am on your side. If you want your whole IT kept in view regularly, see Technical Partner. If something is already stuck, the right start is a diagnosis.
A review of a proposal or purchase
I read the proposal, RFQ or contract and ask what it rests on: what it assumes, what it leaves out and whether all of the work is needed.
You get a straight recommendation. What to accept, what to change and what still needs asking of the vendor.
See an exampleAlongside you in the decisions
When there are several decisions, I am part of each one: scope, comparing proposals and assessing the vendor's work. I raise the risks in time.
The role is agreed case by case. Your own people handle schedules, hour tracking and status updates.
See an exampleThe review in practice
The proposal was technically correct:
15 hours instead of 150
An old email relay service was reaching the end of its life. A large international vendor proposed reconfiguring every system and printer that sent email: about ten services plus the multifunction printers, an estimated 150 hours.
The proposal was technically correct and it would have worked. Nobody had asked whether the traffic needed a new route at all. I replaced the old service with a single relay on the same address and certificate. No other system noticed that anything had changed.
15 hours of work, same result. A vendor's estimate is not the same thing as an estimate of what you need.
The gap in the RFQ
Everyone wanted the automation. Nobody had checked what it would be built on:
An RFQ on a base that wouldn't hold
A customer was preparing an integration automation. The RFQ described the target state, and the target state was right. But the data on the integration platform was a mess. People knew that, and nobody had connected it to the RFQ, because cleaning it up was nobody's project.
I went through the scope and the architecture and took the state of the data to management before it became a problem. The automation would have been built on an unreliable base, and the fix would have been paid for twice.
The customer approved and funded a separate €15,000 clean-up. The gap was found before anything was built.
How it proceeds
First a call, then the price in writing, then the review. What happens after that is your decision.
15-minute call
Tell me what decision you're facing and when it has to be made. I'll say straight whether there is anything here worth spending money on.
Price in writing
I scope the review and give you a fixed price before anything starts. It holds.
The review
I read the material, interview the people the decision affects and ask the vendor for more if needed.
Recommendation and decision
We go through the result together: what to accept, what to change and what still needs asking. If more decisions follow, I can join those too.
No new system needed
Managing orders and tasks was slow and entirely manual. The natural next step would have been to buy an ERP or ticketing system. I built the whole process on the licenses the customer was already paying for, and the manual logging disappeared.
No new software cost. The best option was not to buy anything new.
Why me?
I don't represent any vendor and I resell nothing, so I gain nothing whichever way you decide. My only interest is that the decision is right.
A server-update automation had failed three times. The tool was new to me, and the work still reached implementation. If you want a 50-page explanation of why something is difficult, don't call me.
Kalle gave us a clear picture of our environment's current state and prioritized what to tackle first. I especially appreciated getting straight answers without a sales pitch.
Four qualities
Independent
I judge the proposal by what you need.
Straight-talking
I tell you straight what is unnecessary and what is good. Even when it's awkward.
Efficient
15 hours instead of the 150 the vendor proposed.
Experienced
Systems at a hospital, a city, a pension institution and a software company. I have sat on both the buyer's and the vendor's side of the table.
FAQ
The proposal is already on the table and time is short.
Tell me the deadline on the call. The review is fitted to your decision's schedule, quickly if need be. The hurry is usually the seller's, not the buyer's.
We have our own IT person.
All the better. I work alongside them, not instead: they know the environment, I bring an outside view and tell management what is hard to say from inside.
You don't know our system.
I don't need to. Technology changes, the logic stays: I quickly work out how things really run at your end and ask the questions nobody inside is asking any more. Whoever wrote the proposal knows the system well enough, which is exactly why it needs a second reader.
What does it cost?
The price is agreed in a 15-minute call once I know the scope, and you get it in writing before anything starts.
Let's talk.
Tell me what decision you're facing. I respond within 24 hours.